Local 302 operating engineers (my local) are prepping the launch pit for the boring machine. Pile driving (vibrator head) for hole shoring, when the driver meets more resistance in the ground it will osculate at a higher rate. Construction schedule for the area.... http://www.wsdot.wa.gov/Projects/SR9...urrentWork.htm